Our Projects

OUR CLIENTS
OUR CLIENTS

Trusted by Industry Leaders

Project 01
Project 01

Electrical Heat Tracing – Tuah Power Plant

Year: 2018
Main Contractor: General Electric & Hyundai Heavy Industries
End User: Tuah (EDRA) Melaka Power Plant
Location: Alor Gajah, Melaka

Scope of Work:
Design, engineering, supply, installation, and commissioning of electrical heat tracing for a 5,000-meter fuel gas pipeline using self-regulating cables.

Project Overview:
The power plant consists of three combined-cycle blocks, each with a capacity of 747.7MW. The system ensures optimal temperature maintenance at 47°C for efficient operation.

Project 02
Project 02

Electrical Heat Tracing – TDAE Orgkhim Plant

Year: 2019
Main Contractor: ESSTAR Vision Sdn Bhd
End User: Norman Process Oils Malaysia Plant Sdn Bhd
Location: Tanjung Langsat, Johor

Scope of Work:
Complete EPIC execution of electrical heat tracing for ISBL & OSBL systems, covering approximately 15,000 meters of self-regulating cable.

Project Overview:
The facility produces 70,000 tons annually of TDAE, TRAE, and S-RAE products. The system maintains process temperatures at 90°C for operational efficiency.

Project 03
Project 03

Electrical Heat Tracing – Hess Wellhead Platforms

Year: 2021
Main Contractor: Sapura Energy Berhad
End User: Hess Exploration & Production (Malaysia) B.V
Location: Offshore Peninsular Malaysia

Scope of Work:
Design, supply, installation, and commissioning of heat tracing systems, including power cabling, hazardous area distribution boards, and thermal insulation.

Project Overview:
Covers multiple wellhead platforms (Bunga Kangsar, Bunga Dahlia, Bunga Teratai) with temperature maintenance at 36°C.

Project 04
Project 04

Electrical Heat Tracing – Kasawari CPP

Year: 2022
Main Contractor: Malaysia Marine and Heavy Engineering Berhad (MHB)
End User: PETRONAS Carigali
Location: Offshore Sarawak, Malaysia

Scope of Work:
Full EPIC scope for heat tracing systems including hazardous area electrical systems and insulation works.

Project Overview:
The Kasawari field holds approximately 3.2 TCF of natural gas, with production capacity of 660 MMSCFD. Temperature maintained at 47°C.

Project 05
Project 05

Electrical Heat Tracing – Specialty Chemicals Plant

Year: 2022
Main Contractor: Dialog E&C Sdn Bhd
End User: PETRONAS Chemical Group
Location: Kerteh, Malaysia

Scope of Work:
Design, supply, installation, and commissioning of heat tracing systems for pipelines, vessels, tanks, and instruments (~15,000 meters).

Project Overview:
Supports specialty oxyalkylates production with temperature maintenance at 90°C.

Project 06
Project 06

Electrical Heat Tracing – FPSO Module

Year: 2022
Main Contractor: NOV
End User: Woodside Energy Group
Location: Carnarvon Basin, Australia

Scope of Work:
Engineering, supply, and supervision of electrical heat tracing systems for offshore FPSO gas processing modules.

Project Overview:
Designed for processing up to 1.8 BSCF/D of natural gas. System maintains temperature at 121°C.

Project 07
Project 07

Metering & Control System – Sepang

Year: 2021
Main Contractor: Kejuruteraan QKS Sdn Bhd
End User: PETRONAS Gas Berhad
Location: Sepang, Malaysia

Scope of Work:
Design, engineering, supply, installation, and commissioning of HMI systems, gas chromatograph analyzer, and metering control panel.

Project 08
Project 08

Metering & Control System – Banting

Year: 2022
Main Contractor: Kejuruteraan QKS Sdn Bhd
End User: PETRONAS Gas Berhad
Location: Banting, Malaysia

Scope of Work:
Complete system integration including HMI, analyzer systems, shelter, and metering control panel for industrial metering station.

Need Engineering Solutions?

Get reliable engineering support tailored to your needs.